2009
The 3rd treatment system was constructed to treat the Oneida #3 Tunnel Discharge outside of Eagle Rock Resort. The system was fashioned after the Audenreid Treatment System, but only has 1 limestone tank (with plans to build a second) and treats about 3,000 gpm of mine water.