2004
The Catawissa Creek Restoration Association (CCRA) with the help of DEP 319 Program and EPCAMR have developed a Catawissa Creek Watershed Implementation Plan to address the Total Maximum Daily Load (TMDL) Report. This document explains the various pollution sources, what needs to be done to meet Pollutant Load Reductions required by the TMDL and the estimated cost to bring the Catawissa Creek back to its designated use.